Fieldr Sports — Fit · Track · Record
⚡ Fieldr Pro™ Commercial Launch: Only 142 spots remaining at ₹499 (Regular Price: ₹1999)
Institutional Sports Infrastructure Modeling

Know Your Numbers Before You Spend a Single Rupee.

Most pickleball, padel, and turf facility developers overshoot Day 1 CAPEX by ₹8–12 Lakhs and underestimate monthly burn. This 5-sheet interconnected model reveals your exact capital outlay, monthly break-even, and 5-year cash flows.

Launch Pro Workspace
140+
Indian Facilities Audited
17 CAPEX
Itemized Civil Lines
Bank-Grade
DSCR & Debt Ready

Live Sports Facility ROI Simulator

Instant real-time calculations calibrated to Indian market benchmarks

Live Engine
Court Count:3 Courts
1 Court4 Courts8 Courts
Location Tier:
Peak Slot Rate:₹750/hr
₹300₹1,000₹2,000
Peak Occupancy:75%
40%70%95%
Turnkey CAPEX₹33.23 LakhsCivil, Lights & Surface
Monthly Revenue₹7.38 L/moSlots + Academies + Cafe
Monthly Burn (OPEX)₹2.55 L/moRent, Power & Staff
Year 1 EBITDA₹57.99 Lakhs65.5% Margin
Capital Payback~9.2 MonthsFull Outlay Recovery
5-Yr Net Profit₹2.43 CrROIC: 730.8%
Ready to model your exact site?
Institutional Feasibility Blueprint

The 5-Module Sports Facility Financial Architecture

Real infrastructure rates, 17 itemized CAPEX line items, 11 operating burn heads, and 5-year cash flows. Built to eliminate the 35%+ budget overruns that trap first-time sports arena developers.

Launch Pro Dashboard
Civil Base Blindspot
₹8.5 Lakhs

Average rework cost when soil gradient, laser screed slope, and M20 concrete specs are guessed instead of engineered.

Connected Power Shock
+32% Monthly Burn

Higher electricity expenses when commercial 3-phase high-mast load factors and DG power backups aren't modeled upfront.

Revenue Trap
Month 14 vs 6

Breakeven delay caused by relying solely on peak evening pay-and-play slots without structured coaching academies and club tiers.

Institutional Armor
100% Calibrated

Every formula, cost coefficient, and tax tier is audited against 140+ operating courts across Tier-1 and Tier-2 Indian metros.

Module 01 of 05

Itemized Capital Expenditure Architecture (17 Heads)

Covers Sub-Base Earthworks, Laser-Screed PCC, US Open Spec Acrylic Cushion, 400W High-Mast LED Lighting, Fencing, Prefab Pods, and Statutory Approvals.

17 Engineering Heads
CodeCategoryItem Engineering DescriptionDimension / ScopeContractor Rate Sheet
CIV-01Sub-Base Civil Works
Sub-Base Excavation, Grading & Compaction
Essential base preparation with perimeter slope
7,500 Sq. FtBenchmark Rate Teased
CIV-02Sub-Base Civil Works
PCC Sub-Base Concrete (M20 grade, 4" with mesh)
Reinforced foundation for 10+ year structural life
7,500 Sq. FtBenchmark Rate Teased
CIV-03Sub-Base Civil Works
Asphalt Base Overlay / Laser-Leveled Screed
Prevents puddle formation and ensures true bounce
7,500 Sq. FtBenchmark Rate Teased
FLR-01Flooring & Coating
8-Coat US Open Specification Acrylic Cushion Flooring
ITF Pace 3 certified tournament cushion surface
7,500 Sq. Ft ₹ [LOCKED]
FLR-02Flooring & Coating
Regulation Court Line Marking (2-Coat Polyurethane)
Official USA Pickleball regulation dimensions
3 Courts ₹ [LOCKED]
LGT-01Sports Lighting & Electrical
Tournament-Grade 400W LED Floodlights (IP66, 300+ Lux)
4 poles per court, 1000W equivalent high-efficiency
12 Units ₹ [LOCKED]
LGT-02Sports Lighting & Electrical
GI Octagonal High-Mast Poles (6-meter height)
Hot-dip galvanized, wind-resistant engineering
6 Units ₹ [LOCKED]
LGT-03Sports Lighting & Electrical
Commercial Wiring, MCB Distribution Panel & Cabling
Dedicated 3-phase industrial electrical connection
1 Lot ₹ [LOCKED]
ENC-01Fencing & Netting Enclosures
Galvanized Chainlink Perimeter Fencing (10ft Height)
Ball containment between courts and campus borders
350 R. Ft ₹ [LOCKED]
ENC-02Fencing & Netting Enclosures
Heavy-Duty UV-Stabilized HDPE Overhead Ball Stop Net
Protects adjacent properties and parked vehicles
4,500 Sq. Ft ₹ [LOCKED]
ENC-03Fencing & Netting Enclosures
Tournament Permanent Steel Posts & 3.0mm Braided Nets
Official brass winder mechanism, heavy-duty posts
3 Sets ₹ [LOCKED]
AMN-01Civil Amenities & Modular Pods
Perimeter Trench Drainage with Galvanized Grating
Ensures courts dry within 30 mins after heavy rain
280 R. Ft ₹ [LOCKED]
AMN-02Civil Amenities & Modular Pods
Prefab Modular Container Reception, Pro-Shop & Lounge
Includes reception counter, pro-shop & player seating
400 Sq. Ft ₹ [LOCKED]
AMN-03Civil Amenities & Modular Pods
Player Restrooms & Changing Room Modular Setup
Dual executive washroom pods with plumbing fittings
2 Units ₹ [LOCKED]
MIS-01Statutory Approvals & Starters
Local Authority NOC, Electrical Sanction & Fire NOC
Municipal permissions & commercial electrical sanction
1 Lumpsum ₹ [LOCKED]
MIS-02Statutory Approvals & Starters
Safety Signage, Benches, First-Aid Kit & Dividers
Court-side amenities & essential emergency gear
1 Lumpsum ₹ [LOCKED]
MIS-03Statutory Approvals & Starters
Initial Paddle & Ball Inventory (Rental & Pro-Shop starter)
20 demo paddles & 200 tournament outdoor balls
1 Lumpsum ₹ [LOCKED]

Unlock Complete Pan-India Rate Sheets & Bill of Quantities

Access item-by-item material cost breakdowns, supplier margins, and auto-scaling square footage formulas in the Pro Dashboard or native Excel.

Unlock All Rates (₹499) →
The Decision Matrix

Free Spreadsheets vs. Fieldr Pro™ Feasibility Dashboard

Why relying on free templates or vendor quotes leads to multi-lakh budget blowouts.

Key Evaluation CriteriaFree Spreadsheets & Napkin MathFieldr Pro™ Dashboard
Sub-Base Civil & Drainage Specs❌ Rough square foot lump sum. Ignores laser screed and trenching.✅ 17 itemized civil lines with M20 concrete, screed, and drainage costing.
Revenue Stream Modeling❌ Only hourly pay-and-play. Misses 50%+ of potential earnings.✅ 10 diversified channels: Academies, VIP club, F&B, corporate buyouts.
Resurfacing Sinking Fund & Real OPEX❌ Zero reserve fund. Owners face ₹4.5L shock in Year 3.✅ Monthly sinking fund built in for 36-month acrylic recoating.
5-Year Cashflow & Corporate Tax❌ Single-year rough math. Ignores 25% tax and rent escalations.✅ Complete 60-month P&L with 8% lease escalation & 25% tax.
Pan-India Contractor Directory❌ Middlemen broker markups (15–25% higher cost).✅ Direct contacts for verified turf, high-mast, and acrylic suppliers.
Bank Loan & Investor Readiness❌ Unprofessional notes rejected by bank credit officers.✅ Bank-grade financial model + investor pitch deck template included.
Commercial Launch Special: ₹499 (Regular: ₹1999)

Instant digital access • Unencrypted Microsoft Excel + Interactive SaaS Dashboard

Access Pro Dashboard
⚠ The 5 Fatal Mistakes

Why 60% of New Sports Facilities Hemorrhage Cash

Before you sign a 5-year commercial lease or transfer contractor advance payments, make sure you aren't walking into these unmodeled cash traps.

Overbudgeting CAPEX by ₹8–12 Lakhs

Hidden foundation sub-base compaction, monsoon drainage trenching, surge protection, and commercial 3-phase sanction surprise first-time operators.

✓ Protected in Fieldr Pro Model

Monthly Burn Rate Underestimation

Commercial electricity connected loads, DG backup fuel, staff payroll, and turf cleaning chemicals cost ₹2.5L+ monthly for standard facilities.

✓ Protected in Fieldr Pro Model

Relying Exclusively on Peak Court Bookings

Empty weekday morning slots bleed cash. Facilities without structured coaching academies and corporate leagues struggle to stay cash-positive.

✓ Protected in Fieldr Pro Model

Zero Payback Period Visibility

Entering a ₹30L+ capital commitment without knowing whether break-even is at Month 6 or Month 36 is an existential business gamble.

✓ Protected in Fieldr Pro Model

Spending ₹35,000+ on Generic Consultants

Management consultants charge high retainers for generic templates that lack real Indian sports material vendor rates and monsoon drainage specs.

✓ Protected in Fieldr Pro Model
Got Questions?

Frequently Asked Questions

Everything you need to know about the Fieldr Pro™ financial model and SaaS engine.

Yes! The workbook is built in native unencrypted .xlsx format. You can download and run it directly in Microsoft Excel (Windows/Mac), Apple Numbers, or import it into Google Sheets with 100% of formulas, cell references, and summary models intact.